Client: EDF/Host
Location: Hinkley Point & Bridgewater
Size: 1,176 SqM
Revisionr was retained by TCi GB, a Tier One supplier to EDF Energy, to liaise with HOST on the FF&E package for the two central amenities buildings being built to house workers on the Hinkley Point Nuclear Power Station.
During this process HOST instructed Revisionr to look at designs for the 4 bars in the two buildings locations. The brief was to offer two differing environments; a local pub and a sports bar. The fit-out was handled by TCi GB running in parallel with their procurement contract.